search
Barnsley
Batley
Bedale
Beverley
Bingley
Bradford
Bridlington
Brighouse
Castleford
Catterick Garrison
Cleckheaton
Cottingham
Darlington
Dewsbury
Doncaster
Driffield
Elland
Filey
Goole
Guisborough
Halifax
Harrogate
Hawes
Hebden Bridge
Heckmondwike
Hessle
Holmfirth
Huddersfield
Hull
Ilkley
Keighley
Knaresborough
Knottingley
Leeds
Leyburn
Liversedge
Malton
Mexborough
Middlesborough
Mirfield
Morley
Normanton
Northallerton
Ossett
Otley
Pickering
Pontetfract
Pudsey
Redcar
Richmond
Ripon
Rotherham
Saltburn-by-the-Sea
Scarborough
Selby
Settle
Sheffield
Shipley
Skipton
Sowerby Bridge
Stockton-on-Tees
Tadcaster
Thirsk
Todmorden
Wakefield
Wetherby
Whitby
Yarm
York
Planned Roadworks In Yorkshire And The Humber – Summary For Monday 9 July To Sunday 15 July 2018
The following summary of planned new and ongoing road improvements over the coming week is correct as of Friday 6 July and could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.

M1 junction 42 Lofthouse

The southbound entry slip road will be closed overnight on Wednesday 11 July for technology repairs. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M1 junction 34 Tinsley

The northbound exit slip road will be closed overnight for three nights from Wednesday 11 July for technology repairs. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M18 junction 7 to M62 junction 35 Langham

The northwest link will be fully closed overnight for five nights from Monday 9 July for bridge work. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M62 junction 30 to junction 31 Normanton

The westbound carriageway will be fully closed overnight on Monday 9 July for carriageway repairs. The eastbound carriageway will be fully closed overnight on Tuesday 10 July for carriageway repairs. The closure will take place from 8pm to 6am, and drivers will be able to follow clearly signed diversion routes.

M62 junction 32a Holmefield to junction 33 Ferrybridge

The eastbound exit slip road at junction 33 will be fully closed overnight for five nights from Monday 9 July for barrier work. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M621 junction 1 Beeston to junction 7 Stourton

The clockwise carriageway will be fully closed overnight for three nights from Wednesday 11 July. The anticlockwise carriageway will be fully closed overnight for two nights from Monday 9 July. The closures for resurfacing will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes. A 30mph speed restriction is in place on the anticlockwise carriageway 24/7.

M180 junction 1 to junction 2 Woodhouse

The eastbound and westbound carriageway has a 50mph speed restriction and narrow lanes with lane 3 closed in place until December for barrier work. The speed restriction is in place 24/7.

A57 Hattersley Roundabout to Market Street

The eastbound carriageway will be fully closed overnight for five nights from Monday 9 July for carriageway repairs. The closures will take place between 7pm and 6am and drivers will be able to follow a clearly signed diversion route.

A1M junction 35 Wadworth

The northbound exit slip road at junction 35 will be fully closed overnight for five nights from Monday 9 July for barrier works. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

A180 Great Coates

The eastbound exit slip road will be closed overnight on Thursday 12 July for carriageway repairs. The closures will take place between 8pm and 6am, drivers will be able to follow a clearly signed diversion route.

A64 Bilbrough to Askham Bryan

The eastbound and westbound carriageway has a 40mph speed restriction in place until August for barrier renewal work. The speed restriction is in place 24/7.

Planned Roadworks In Yorkshire And The Humber – Summary For Monday 9 July To Sunday 15 July 2018, 6th July 2018, 14:40 PM